Back
LT325 Tower Transport Frame
For 5 MW tower on both ship and lorry
Transport frame for 5 MW tower sections. The frame system is used as lifting equipment during erection on-site of the 5 MW tower.
Highlights
- WLL: 220 t.
- When used during transportation with transport adapter mounted: 140 t.